
MotiraTech ES-250 — 250 kW / 559.1 kWh Industrial Battery Energy Storage System
A liquid-cooled LFP commercial and industrial energy storage system with integrated bidirectional power conversion and energy management, configured for North American 480 Vac installations.
Where the ES-250 fits
The ES-250 is the larger of two commercial and industrial configurations in the same modular platform. It suits facilities whose demand peaks or load-shifting duty require 250 kW of power and roughly twice the energy of the ES-125, without changing the system architecture or site interface.
Battery, power conversion and energy management are supplied as one engineered package, so the site interface is a single defined connection point rather than a set of separately integrated components. Whether this configuration is appropriate for a particular site follows from measured load data, the applicable tariff and the available electrical infrastructure.
| 01Model | MotiraTech ES-250 |
|---|---|
| 02Rated power | 250kW |
| 03Rated energy | 559.1kWh |
| 04Battery chemistry | LFP |
| 05Cooling | Liquid-cooled battery system |
| 06Power conversion | Integrated bidirectional PCS |
| 07Controls | Integrated EMS |
| 08Architecture | Modular and scalable |
| 09Nominal grid voltage | 480Vac |
| 10Enclosure | NEMA 3R (PCS and battery cabinets) |
| 11Fire suppression | Integrated |
| 12Configuration | North American |
Documented application modes
- 01Peak shaving / demand-charge management
- 02Load shifting
- 03Self-consumption
- 04PV energy shifting
- 05Time-of-use optimization
- 06Active and reactive power control
- 07Zero-export applications
Listed standards
- 01UL 9540 (system)
- 02UL 1973 (battery)
- 03UL 9540A (battery)
- 04UL 1741-SA/SB Ed. 3 (PCS)
- 05CSA C22.2 No. 107.1-16 (PCS)
- 06IEEE 1547-2018 (PCS)
- 07IEEE 1547a-2014 (PCS)
- 08FCC Part 15 (PCS)
System components



Where this system is used
The ES-250 is selected against an application, not the other way round. These are the application routes it is most often assessed for.
Peak demand management
Managing billed demand where the tariff and load profile justify it.
Remote industrial power
Off-grid and weak-grid sites with local generation.
Mining operations
Processing plants, mine infrastructure and remote sites.
Request a BESS assessment
Send interval load data, your tariff and the site's electrical arrangement. We will confirm whether this configuration is the right basis before anything is quoted.
